Perform a Controller Failover Using the GUI
Before you begin
Failover requires one controller to be in active mode and the other controller to be in standby mode.
Procedure
- From the main menu, choose .
- From the list of arrays, click the array you want to fail over.
- In the Array view, note which controller is Active and which is Standby.
- Click Make Active on the Standby controller.
- In the confirmation dialog box, click Yes.